Our New School

Our school had been five years in the process of getting new facilities. In 2014 the classrooms were discovered to be leaky, moulded and deemed unfit for use. Finally, in 2018 we received the exciting news that a solution for the school redevelopment was available.


The solution presented to our school from A-Line Construction was the A-Space modular construction option. Since our school is situated in a remote location, the transportable A-Space modular option was a perfect fit. The A-Space modules were built offsite at A-Line Construction’s yard in Whangarei then transported to our school. Once the A-Space modules were onsite the buildings were joined with covered walkways, ramps and decks so that they fit comfortably into the surroundings. The transportable, modular option meant the new buildings were cost-effective while providing great value, as well as causing minimal disruption to our school life.


Our school redevelopment was constructed of twelve A-Space modules, creating seven learning spaces, an administration area, resource room, staff room and hall. Our school field was levelled and landscaped and now is a nice flat area for our students to play. New fences were installed around the entire school and the pool change building was upgraded also.